Page 1 Acts III Malawi Africa Orphanage
Project Pictures
Note many of the pictures have larger one linked to
them.
Just click on the pictures to open the larger ones.
 |
April 27,
2008 - This is the lower round Gazeebo. This is on the front
corner near the Girls dorm room. as of the 30th it is nearly
completed. |
 |
This picture shows the gazebo
from above. It will tie in with and connect the front retaining
wall and the Rick Thomas Drain. The
Gazebo itself will have a thatch roof. There will also be
another gazebo on the opposite front corner of the building
facing out over the Ndirande mountain side. What a beautiful
view that will be! |
 |
This is a
small picture of the front drain. It has been concreted on the bottom
and the bricks on the side positioned. Next they will plaster it
completely.
Click on the picture for a larger view |
 |
This
shows how they are plastering the front rooms. They are applying
a smooth layer of concrete on the walls. This will allow them to
be painted. Once the plastering is done, they will add a ceiling
(wood) and then finish the electrical. |
More coming soon. To see
earlier pictures of the Malawi Orphanage Project, click here
|